Sheffield and Rotherham still make things. Steel and special metals, forging, tooling, precision engineering and the advanced manufacturing firms clustered around the M1 between the two towns all run power-hungry kit through the working day. Many of them are owner-managed businesses in buildings they own, so the decision about solar can be made by the people who pay the electricity bill. BrightEdge Solar designs and installs commercial solar PV and battery storage for factories, workshops, warehouses, farms and public buildings across Sheffield, Rotherham and Barnsley. We’re based in Beverley, East Yorkshire, and travel nationally for larger commercial projects.
CNC machines, presses, compressors, extraction, welding sets and lighting all run while the sun is up. Every unit you generate and use on site is a unit you don’t buy at full price.
Once installed, the energy your panels generate isn’t exposed to future price rises.
From first call to aftercare

Initial call: we look at your bills and, ideally, half-hourly data. Desktop design: satellite imagery and mapping give us an initial layout and estimate, often before we visit.

Site survey: roof, structure, electrical supply, existing G99 approvals and access. Proposal: final design, expected generation, costs and timescale.

G99 application: we submit and track it, along with any planning application. Installation and commissioning: MCS-compliant, planned around your busy periods.

Remote monitoring, plus optional annual maintenance to MCS MIS3002.
Initial call: we look at your bills and, ideally, half-hourly data. Desktop design: satellite imagery and mapping give us an initial layout and estimate, often before we visit.
Site survey: roof, structure, electrical supply, existing G99 approvals and access. Proposal: final design, expected generation, costs and timescale.
G99 application: we submit and track it, along with any planning application. Installation and commissioning: MCS-compliant, planned around your busy periods.
Remote monitoring, plus optional annual maintenance to MCS MIS3002.
See our recent projects
Metals, tooling, cutlery and blade makers, fabrication, food producers and precision engineers in the Don Valley, Attercliffe, Tinsley, Templeborough and the Rother Valley. On shaded urban sites we use panel-level optimisers so one shaded corner doesn’t drag down the rest of the array. In Rotherham we did exactly that on a 69.16 kWp SolarEdge system for a local manufacturer.
Distribution and trade units along the M1 corridor and the Lower Don Valley. See warehouse and industrial solar for roof types and the checks we make. Schools use most of their power in the daytime during term, so we plan installs around the school calendar, often in the holidays.
Including on systems installed by other firms: inspection, fixing and re-certifying non-compliant systems, and ongoing maintenance.
Yes. We cover Sheffield, Rotherham, Barnsley and the surrounding area from our base in Beverley, and we’ve installed a 69.16 kWp SolarEdge system for a manufacturer in Rotherham.
Northern Powergrid runs the local network across Sheffield, Rotherham and Barnsley. We handle the G99 application with them, which typically adds 8–12 weeks before installation.
Often, yes. Panel-level optimisers let each pair of panels work at its own best output, so shade on one part of the roof doesn’t pull down the rest. We assess shading at survey and design around it.
Typically about £17,000–£21,000 for 30 kWp, £28,000–£37,000 for 50 kWp and £50,000–£65,000 for 100 kWp, excluding VAT. Systems of 150 kWp and above are typically about £420–£650 per kWp. Book a free survey for an accurate quote.
Yes. We are CHAS accredited, which public bodies and main contractors often ask for, and we plan work around term times, opening hours and occupied buildings.
A 50–150 kWp roof typically takes about 1–2 weeks on site, after G99 approval. You’ll only lose power briefly for the final connection, and we can schedule that out of hours.