Farm and rural solar PV and battery storage across Yorkshire and the UK

Solar Panels and Battery Storage for Farms

Farms have big roofs, spare land and plenty of daytime demand, and they’re often paid very little for the power they export. BrightEdge Solar designs and installs solar PV and battery storage for farms and rural businesses: on asbestos and fibre-cement sheds, new steel-framed buildings, re-clad stores and open ground. We’re based in Beverley, East Yorkshire, and have installed on farms and rural sites across East and North Yorkshire. We work across the UK.

Call 01482 765063

See if we cover your area
Delivered For
Boeing Integra Indurent RAF NHS Modulek Biffa Fire Service Boeing Integra Indurent RAF NHS Modulek Biffa Fire Service

Why solar suits farms

Solar and batteries that fit how a farm uses power, not just the roof.

CHAS Elite accredited · MCS certified · RECC member

How a project runs

From off-site design to aftercare

How a project runs
From off-site design to aftercare
Off-site design

We study the site from satellite and mapping data and send an initial design and quote, subject to survey.

Site survey and final quote

We survey the roof or ground, structure, supply, cable routes and where a battery could go. You then get a clear final price, contract terms and our workmanship guarantee.

Paperwork and installation

We handle G99, planning where needed and other approvals. Then scaffolding, and installation by our own electricians.

Handover and aftercare

A handover pack, monitoring set-up and your insurance-backed warranty registered for you. Optional annual maintenance to MCS MIS3002.

Farm buildings and land we work with

See our recent projects

Asbestos and fibre-cement sheds

These need care, because some sheets can’t take foot traffic or fixings. At North Dalton we fitted lightweight JA Solar panels to a split corrugated and asbestos roof. Where a roof isn’t suitable, options include over-cladding or putting the array somewhere else.

New steel-framed sheds

Trapezoidal sheeting is quick to build on. At Ellerton we installed across two newly built agricultural sheds.

Tired stores and barns

If the roof sheets are past their best, re-clad first, then add solar. At Little Habton we re-clad an old store in trapezoidal sheeting and turned it into a solar and battery store.

Open ground

At Wapplington near Pocklington we installed a ground-mounted array on ballasted mounts, which need no piling or concrete foundations and can be moved or extended later.

FAQ

Farm solar questions

Sometimes. It depends on the condition of the sheets and whether they can take fixings. At North Dalton we fitted lightweight panels to a split corrugated and asbestos roof. Where a roof isn’t suitable, options include over-cladding or putting the array elsewhere.

Yes. At Ellerton we used two 8 kW single-phase inverters and fitted a new single-phase distribution board. We check your supply at survey and tell you what it can take.

Often, because export rates can be very low. One farm client was offered just 4p/kWh, so we installed 41.93 kWh of storage to use that power on site instead. We model your half-hourly data before recommending a size.

Only if it’s designed for backup. For a farm-based business in the East Riding we installed a Sigenergy system with 60 kW of whole-building backup. If backup matters to you, tell us at the start.

Many rooftop systems on farm buildings fall under permitted development. Listed buildings, conservation areas and protected landscapes have tighter rules, and ground-mounted arrays may need planning depending on size and location. We check and apply if needed.

Rooftop solar typically costs about £17,000–£21,000 for 30 kWp, £28,000–£37,000 for 50 kWp and £50,000–£65,000 for 100 kWp, excluding VAT. Batteries typically cost about £350–£450 per kWh installed. Ground-mounted arrays and re-cladding are priced after survey.

Single-phase or three-phase supply

Many farms only have a single-phase supply, and that doesn’t rule solar out. At Ellerton we used two 8 kW single-phase Solis inverters and fitted a new single-phase distribution board. On three-phase farms we use three-phase inverters, such as the 20 kW Solis unit at North Dalton or Fox ESS and Sigenergy hybrids for battery systems. We check your supply at survey.

Batteries and backup power on farms

  • Store what you’d otherwise export. On an East Riding farm we replaced a Solis 20 kW inverter with a Fox ESS H3 20 kW hybrid, reused the existing cabling and installed 41.93 kWh of Fox ESS batteries inside the farm shed.
  • Keep the site running in a power cut. For a farm-based business in the East Riding we installed a 54.24 kWh Sigenergy battery (expandable to 108 kWh) with a backup gateway giving 60 kW of whole-building backup.
  • Size from data, not guesswork. We look at your half-hourly data, solar generation and tariff before recommending a battery. More on commercial battery storage.

Holiday lets, farm shops and EV charging

Solar on a farm building can also supply nearby holiday lets, lodges or a farm shop. At North Dalton, alongside the shed array, we fitted a 22 kW Myenergi Zappi charger in the car park, so holiday-let guests can charge their cars on surplus solar instead of it being exported for very little.

Grid connection (G99) on rural networks

Most farm systems are big enough to need G99 approval from the network operator before installation (anything over 16A per phase, about 3.68 kW single-phase or 11.04 kW three-phase). Across Yorkshire and northern Lincolnshire that’s Northern Powergrid. Rural networks can be limited, so the DNO may restrict how much you export. We design around that with export limitation, a battery, or both. Our ground-mounted system at Wapplington near Pocklington uses a Solis Export Power Manager for exactly this. G99 approval typically adds 8–12 weeks, and we prepare the application and deal with the DNO for you. G99 applications explained.

Planning permission

Many rooftop systems on farm buildings fall under permitted development, subject to conditions and size limits. Listed buildings, conservation areas and protected landscapes have tighter rules, and ground-mounted arrays may need planning depending on their size and location. We check your site and handle the application if one is needed.

Typical costs

Indicative installed costs for rooftop solar PV on commercial and farm buildings (ex VAT):

  • 30 kWp: about £17,000–£21,000
  • 50 kWp: about £28,000–£37,000
  • 100 kWp: about £50,000–£65,000
  • 150 kWp and above: about £420–£650 per kWp

Battery storage typically costs about £350–£450 per kWh installed, including the hybrid inverter. Prices exclude VAT. Asbestos or fibre-cement roofs, re-cladding, ground mounting, trenching and long cable runs are priced after survey, because they vary so much between farms. Every quote lists equipment, installation, scaffolding and DNO costs separately.

Paying for it

  • Outright purchase: usually the best long-term return.
  • Finance or leasing: spreads the cost. See solar finance.
  • Power Purchase Agreement (PPA): a funder pays for the system and you buy the power at an agreed rate, typically over 25 years. See PPAs.

Farm and rural projects we’ve completed

  • Farm shed solar and EV charging, North Dalton (East Riding). A 19.8 kWp array of JA Solar 555 W panels on a split corrugated and asbestos roof, a 20 kW three-phase Solis inverter, and a 22 kW Zappi charger for holiday-let guests. See the case study
  • Two new agricultural sheds, Ellerton (East Riding). 19.8 kWp of JA Solar 555 W panels across two trapezoidal roofs, two 8 kW single-phase Solis inverters and a new single-phase distribution board. See the case study
  • Re-clad agricultural store with battery, Little Habton (North Yorkshire). New trapezoidal cladding, a 24.64 kWp array and modular Fox ESS battery storage. See the case study
  • Ground-mounted array, Wapplington near Pocklington. All-black panels on ballasted ground mounts, a purpose-built plant room and a Solis export manager. See the case study
  • Barn battery retrofit, East Riding. A Fox ESS H3 20 kW hybrid replaced an older inverter, with 41.93 kWh of batteries indoors in the shed and new three-phase metering. See battery storage
  • Hybrid solar, battery and whole-site backup, farm-based business, East Riding. A 54.24 kWh Sigenergy battery, two 25 kW three-phase controllers and 60 kW whole-building backup. See battery storage

What farm clients have said

“Our solar array was fitted extremely fast with the team working late hours in order to get the array up as fast as they could, they caused no disruption to our holiday rentals and were professional throughout.”
Operational farm and holiday lets, North Dalton
“Extremely professional service at a surprisingly competitive price. It’s clear these guys really take pride in what they offer.”
Agricultural and garden supplier, Ellerton

Why BrightEdge

Get a farm solar assessment

Send us a recent electricity bill and tell us about your buildings and land. Choose “My Farm” on the form and we’ll come back with an initial design.

Book a free farm survey · Call 01482 765063 · info@brightedgesolar.com

BrightEdge Solar Ltd, Colonial House, Swinemoor Lane, Beverley HU17 0LS. MCS certified (NIC-601602). RECC member.