Solar PV and battery storage across Scarborough, Filey, Whitby and the North Yorkshire coast

Solar Panels in Scarborough for Businesses, Hotels, Farms and Homes

See if we cover your area
Delivered For
Boeing Integra Indurent RAF NHS Modulek Biffa Fire Service Boeing Integra Indurent RAF NHS Modulek Biffa Fire Service

CHAS Elite accredited · MCS certified · RECC member

Scarborough’s roofs work hard in summer. Hotels, guesthouses and holiday parks run kitchens, laundry, hot water and lighting through the busiest months, when solar generates most. The industrial units at Eastfield and Scarborough Business Park, farms across the Vale of Pickering, and churches, halls and family homes all use power in daylight too. BrightEdge Solar is an MCS-certified installer of solar panels and battery storage for businesses, farms, community buildings and homes in Scarborough, Filey, Whitby and along the coast. We’re based in Beverley, about 35 miles away, and our nearest job is a 51 kWp flat-roof system at Woodsmith Mine near Whitby, about 16 miles from Scarborough.

Book a free survey · Call 01482 765063

Solar for hotels, guesthouses and holiday parks

Hospitality is the biggest opportunity on this coast, because demand and generation peak together in the summer season. At a guesthouse in Brandesburton, about 32 miles south of Scarborough, we fitted a 20 kWp all-black array on a slate roof, a 20 kW SolaX three-phase inverter, a 6 kW SolaX AC charger and 12 kWh of SolaX battery storage.

What we look at for a Scarborough hotel, guesthouse or holiday park:

  • When you use power. Breakfast, laundry, hot water and bar or restaurant loads run through the day and into the evening. A battery carries midday solar into the evening peak instead of exporting it cheaply.
  • The season. We model output month by month against your occupancy, not just as an annual total, so you can see what the system does in July and in January.
  • Holiday and caravan parks. Reception, clubhouse, pool, laundry and workshop buildings usually have the best roofs and the biggest daytime loads. Where the roofs are small or shaded, a ground-mounted array may suit. We look at where your supply comes in and how it’s split across the site before we design.
  • How it looks. All-black panels sit quietly on slate and suit seafront and conservation-area streets (see planning below).
All-black solar panels on the slate roof of a guesthouse in Brandesburton, East Yorkshire
SolaX inverter, isolators and battery modules in the plant room of a guesthouse in Brandesburton

Flat roofs and coastal wind: our Woodsmith Mine job

Many seafront hotels and commercial buildings have flat roofs, and on an exposed coast the mounting matters as much as the panels. At Woodsmith Mine near Whitby we installed 51.03 kWp of all-black panels on the change house’s flat roof, using a Van der Valk low-ballast mounting system designed for a high-wind location, with 24 kWh of battery storage.

On another flat roof, a new-build care home in Clifton, York, we fitted 47.08 kWp on a lightweight ballasted system that kept the roof loading under 32 kg/m², so the roof needed no structural strengthening and kept its membrane warranty. A care home, like a hotel, uses power around the clock.

Solar panels on ballasted frames beside a cable tray on the flat membrane roof of a new-build care home in Clifton, York
Solis 40 kW three-phase inverter and isolator on a plant-room wall at a care home in Clifton, York

Solar for Scarborough businesses and industrial units

Most of Scarborough’s industrial and trade space is south of the town at Eastfield, around Scarborough Business Park and the Cayton Low Road estates, including Plaxton Park and Dunslow Court, just off the A64. Units there include steel-framed buildings with insulated cladding and three-phase supplies, which suit rooftop solar well. Food production, engineering, workshops, cold stores and trade counters all run through the day.

  • Rooftop PV on profiled metal, insulated composite and fibre-cement roofs, with three-phase inverters sized to your supply
  • Asbestos roofs: we don’t fix panels to asbestos sheets. We overclad the roof with new sheeting and mount the panels on that. Modern fibre-cement roofs can usually take panels directly once we’ve checked their condition.
  • Commercial battery storage to carry midday surplus into late shifts, sized from your half-hourly data (battery storage)
  • EV charging for vans and staff cars

For larger sites across the county, see commercial solar in York and North Yorkshire.

Farms around Scarborough and the Vale of Pickering

Farms from the Vale of Pickering to the moors edge have big sheds, daytime loads from grain, livestock and workshops, and low export prices. At Little Habton in Ryedale, about 25 miles from Scarborough, we re-clad an old agricultural store in new trapezoidal sheeting and installed a 24.64 kWp solar array with modular Fox ESS battery storage. Re-cladding first is often the right answer for a tired or asbestos roof. More on farm solar panels.

Drone view of the re-clad farm store with rooftop solar panels at Little Habton, North Yorkshire
Fox ESS inverter and stacked battery storage in the farm store at Little Habton, North Yorkshire

Churches, charities and community buildings

Churches, chapels, village halls and charity buildings often have large roofs and modest budgets. Solar panels and batteries installed in a building used solely for a relevant charitable purpose are currently zero-rated for VAT, until 31 March 2027, then 5%. We help with the paperwork and the faculty or planning route. Our community example is the grant-funded system at Hessle Sporting Club, 21.6 kWp funded by the FA. See solar panels for churches and solar panels for charities.

Solar panels for Scarborough homes

We fit on-roof and in-roof systems, with or without a battery, for homes across Scarborough, Scalby, Filey, Whitby and the villages. In-roof panels sit flush with the tiles, which suits new builds, re-roofs and homes where looks matter. At Catwick in East Yorkshire, about 33 miles south of Scarborough, we fitted in-roof all-black panels with Fox ESS battery storage on two new-build homes.

Installing solar panels and batteries on a home currently carries 0% VAT, until 31 March 2027. See home solar panels and battery storage.

Aerial view of in-roof all-black solar panels on two new-build homes at Catwick, East Yorkshire
Drone view of all-black in-roof solar panels on a slate roof and a flat-roofed garage at a home in Hessle

Building for the coast

A roof on the South Cliff or above Filey Bay is a different job from one inland, and we design for it:

  • Wind loading. We carry out wind load calculations for every array and choose the mounting and fixing layout to suit, which matters on cliff-top, seafront and moorland sites.
  • Salt air. Panels can be tested for salt-mist corrosion to IEC 61701. On exposed sites we check the panel datasheets and the mounting manufacturer’s coastal guidance before we specify anything, and keep cable runs and isolators protected.
  • Monitoring. We set up remote monitoring at handover, so a fault doesn’t go unnoticed through the busy season.

Planning: conservation areas and the National Park

Since 1 April 2023 North Yorkshire Council has been the planning authority for the former Scarborough borough, outside the National Park. Its conservation areas include Scarborough, Weaponness, Falsgrave, Scalby, Seamer, Filey, Whitby and Sandsend. North of the town, villages such as Robin Hood’s Bay, Fylingthorpe, Staithes and Runswick Bay are in the North York Moors National Park, where the National Park Authority handles planning and has Article 4 directions that remove some permitted development rights.

  • Homes: roof panels are usually permitted development, subject to conditions. In a conservation area, panels on a wall that faces a road need planning permission, and in a conservation area or the National Park, panels on a flat roof need a prior approval application first.
  • Business buildings: roof panels are usually permitted development too, kept at least 1 metre from the roof edge. In a conservation area or the National Park, panels on a wall that faces a road need permission. Larger systems, above 50 kW, need a prior approval application covering design and glare.
  • Listed buildings aren’t covered by permitted development and need listed building consent.

We check your address before we design, and can use all-black or in-roof panels to keep the roofline tidy.

Servicing, repairs and panel cleaning

Already have solar? We service, test and repair commercial and domestic systems, including ones fitted by other installers, here and nationwide. That includes drone thermography for large roofs and arrays, handheld FLIR thermal imaging of isolators, connectors and inverters, inverter and battery checks, panel cleaning and EICRs. Prices are on application. See solar panel servicing and maintenance.

Areas we cover around Scarborough

  • Scarborough: YO11, YO12 and YO13, including the South Bay and North Bay, Falsgrave, Eastfield, Cayton, Seamer, Scalby, Burniston and Cloughton
  • Filey and the south: YO14, including Filey, Hunmanby, Muston and Reighton
  • Whitby and the north: YO21 and YO22, including Whitby, Sandsend, Robin Hood’s Bay and Fylingthorpe
  • Inland: the Vale of Pickering, Pickering, Malton and the farms between
  • Further afield: Bridlington and the East Riding coast, York and the rest of North Yorkshire

These are areas we cover, not a list of past installs.

Recent installs near Scarborough

Job Distance from Scarborough What we did
Flat-roof solar, Woodsmith Mine near Whitby about 16 miles 51.03 kWp all-black panels on Van der Valk low-ballast mounting for a high-wind site, 24 kWh battery
Re-clad farm store, Little Habton about 25 miles New trapezoidal cladding, 24.64 kWp array, modular Fox ESS battery storage
Guesthouse, Brandesburton about 32 miles 20 kWp all-black panels on slate, 20 kW SolaX inverter, 6 kW AC charger, 12 kWh SolaX battery
Care home, Clifton, York about 42 miles 47.08 kWp on a lightweight ballasted flat-roof system, no roof strengthening needed

See all case studies

Grid connection: Northern Powergrid Northeast and G99

Scarborough, Filey and Whitby are on Northern Powergrid’s Northeast licence area, not the Yorkshire area that covers Bridlington, Hull and the East Riding. The first two digits of the MPAN on your electricity bill tell you which: 15 is Northeast and 23 is Yorkshire. A few villages south of Filey sit close to the boundary, so we check your MPAN when we quote.

  • Smaller systems (up to 16 A per phase, about 3.68 kW single-phase or 11.04 kW three-phase) usually connect under G98: we install, then notify the network.
  • Most hotel, holiday park, farm and business systems are larger and need G99 approval before connection. We prepare and submit the application. It typically adds 8–12 weeks, so to have a system running before the summer season, start the conversation in the autumn or winter.
  • Export limits. If Northern Powergrid limits what you can export, we design around it with export limitation, a battery, or both.

Read our G99 application guide.

Funding and finance

  • Businesses, hotels and farms: solar panels are special-rate plant and machinery, so the Annual Investment Allowance can usually cover the cost against profits in the year you buy. Your accountant will confirm how this applies to you. On-site solar and batteries are also exempt from business rates in England until 31 March 2035.
  • Charities and churches: 0% VAT on solar and batteries for qualifying charity buildings until 31 March 2027.
  • Homes: 0% VAT on installation until 31 March 2027. There’s no general government grant for home solar.
  • Local grants: we check what’s open for your postcode when we quote. We won’t promise a grant that isn’t there.
  • No upfront cost: for larger sites, a Power Purchase Agreement or solar finance.

More on funding: solar panel grants for businesses.

Why BrightEdge

  • Proven on this coast: 51 kWp on a high-wind flat roof at Woodsmith Mine near Whitby, and a re-clad farm store with battery at Little Habton
  • Commercial experience: three-phase systems, ballasted flat roofs, overclad asbestos roofs and G99 applications handled for you
  • Accredited: MCS certified (NIC-601602), RECC member, NICEIC, CHAS Elite and a Fox ESS certified installer
  • 24-month insurance-backed workmanship warranty
  • Servicing for existing systems, including ones fitted by other installers (servicing and repairs, nationwide, price on application)

Solar panels in Scarborough: frequently asked questions

Yes. We’re MCS-certified installers based in Beverley, about 35 miles away, and we cover Scarborough, Filey, Whitby and the surrounding villages. Our nearest job is a 51 kWp flat-roof system at Woodsmith Mine near Whitby, about 16 miles from Scarborough.

Often, because hospitality sites use the most power in summer, when solar generates most. A battery moves midday generation into the evening peak. We model it month by month against your occupancy and will tell you if it doesn’t pay.

Yes, if the system is designed for it. We carry out wind load calculations for every array and choose the mounting to suit, as we did with the low-ballast flat-roof system at Woodsmith Mine. On exposed sites we check the panels’ salt-mist testing and the mounting manufacturer’s coastal guidance, and set up remote monitoring at handover.

Northern Powergrid, on its Northeast licence area. Your MPAN should start with 15. Larger systems need G99 approval before connection, which typically adds 8–12 weeks. We submit and manage the application for you.

We don’t fix panels straight onto asbestos: we overclad it with new profiled sheeting and fit the solar on top, as one job. Modern (non-asbestos) fibre-cement roofs are different: once we’ve checked their condition, we can usually fit panels to them directly.

Yes, including systems another installer fitted. We offer health checks with drone thermography and FLIR thermal imaging, inverter and battery checks, panel cleaning and EICRs. Prices are on application.

Get a free solar survey

Send us your address, a recent electricity bill (or half-hourly data for a business) and a photo of the roof. For a hotel, guesthouse or holiday park, tell us roughly how many rooms or pitches you have and when you’re busiest. We’ll come back with an initial layout and estimate, then arrange a survey.

Book a free survey · Call 01482 765063 · info@brightedgesolar.com

BrightEdge Solar Ltd, Colonial House, Swinemoor Lane, Beverley HU17 0LS. MCS certified (NIC-601602). RECC member.