Solar PV and battery storage across Driffield, Nafferton and the Yorkshire Wolds
BrightEdge Solar is a Beverley-based installer designing and fitting solar PV and battery storage for farms, homes and businesses in Driffield, Nafferton and the Yorkshire Wolds. We’re CHAS Elite accredited, MCS certified (NIC-601602) and a RECC member, and we handle the Northern Powergrid G99 application for you.
Driffield sits in the middle of some of the best arable land in the East Riding, and it shows in the buildings: grain stores, machinery sheds, livestock units and the food and engineering firms on the Kelleythorpe estate. Big roofs, daytime loads and, on many farms, a three-phase supply make the Wolds well suited to solar. BrightEdge Solar designs and installs solar panels and battery storage for farms, homes and businesses in Driffield and the surrounding villages. We’re based on Swinemoor Lane in Beverley, about 13 miles down the A164, and we’ve already installed on a farm at North Dalton, 7 miles from the town.
| Job | Distance from Driffield | What we did |
|---|---|---|
| Farm shed, North Dalton | about 7 miles | 19.8 kWp on a split corrugated and asbestos roof, 20 kW three-phase inverter, 22 kW EV charger for holiday lets |
| Guesthouse, Brandesburton | about 14 miles | 20 kWp all-black panels on slate, with 12 kWh battery storage |
| Ground mount, Wapplington near Pocklington | about 16 miles | 29 kWp ground-mounted array on ballasted mounts, with a purpose-built plant room |
CHAS Elite accredited · MCS certified · RECC member
Yes. We’re based in Beverley, about 13 miles away, and we cover Driffield, the YO25 villages and the wider Wolds. Our nearest farm install is at North Dalton, about 7 miles from the town.
Often, yes, if the sheeting is in sound condition. We inspect it first and use fixings and lightweight panels suited to the sheet. If the roof is past its best, re-cladding and installing solar at the same time is usually the better option.
Northern Powergrid, on its Yorkshire network. Larger systems need G99 approval before connection, which typically adds 8–12 weeks. We submit and manage the application for you.
It depends on when you use power. A battery stores midday surplus for the evening or early morning instead of exporting it at a low rate, and it can help where export is limited. We model it from your bills or half-hourly data and will tell you if it doesn’t pay.
Many roof-mounted systems on homes, farms and business buildings are permitted development, subject to conditions. Ground-mounted arrays, listed buildings and street-facing roofs in Driffield’s conservation areas can need permission. We check for your site before designing.
Send us your address, a recent electricity bill (or half-hourly data for a business) and a photo of the roof or ground you have in mind. We’ll come back with an initial layout and estimate, then arrange a survey.
Book a free survey · Call 01482 765063 · info@brightedgesolar.com
BrightEdge Solar Ltd, Colonial House, Swinemoor Lane, Beverley HU17 0LS. MCS certified (NIC-601602). RECC member.