Commercial solar PV and battery storage from Teesside to Tyne and Wear

Commercial Solar Panels for North East and Teesside Businesses

The North East is still a place that makes things. The car plant at Sunderland and its suppliers around Washington, engineering and manufacturing firms on the big County Durham business parks, process, chemical and engineering businesses on Teesside, and farms across Durham and Northumberland all use most of their power during the working day. Plenty of them own their sites. BrightEdge Solar designs and installs commercial solar PV and battery storage for factories, warehouses, farms and public buildings across the North East. We’re based in Beverley, East Yorkshire, and travel nationally for larger commercial projects.

See if we cover your area
Delivered For
Boeing Integra Indurent RAF NHS Modulek Biffa Fire Service Boeing Integra Indurent RAF NHS Modulek Biffa Fire Service

Why North East businesses are looking at solar

We size the system from your actual consumption, not the biggest array the roof will hold.

CHAS Elite accredited · MCS certified · RECC member

How a project runs

From first call to aftercare

How a project runs
From first call to aftercare
Initial call and desktop design

Initial call: we look at your bills and, ideally, half-hourly data. Desktop design: satellite imagery and mapping give us an initial layout and estimate, often before we visit.

Site survey and proposal

Site survey: roof, structure, electrical supply, existing G99 approvals and access. Proposal: final design, expected generation, costs and timescale.

G99 application and installation

G99 application: we submit and track it, along with any planning application. Installation and commissioning: MCS-compliant, planned around your busy periods.

Monitoring and aftercare

Remote monitoring, plus optional annual maintenance to MCS MIS3002.

Where we install commercial solar in the North East

See our recent projects

Factories, warehouses and logistics

Factories and engineering firms. Automotive suppliers, fabricators, precision engineers, plastics, food producers and process businesses in Sunderland, Washington, Newton Aycliffe, Durham, Stockton, Billingham, Middlesbrough, Hartlepool and Gateshead.

Warehouses and logistics. Distribution and trade units on the A1(M) and A19 corridors and around the Tees and Tyne ports. See warehouse and industrial solar.

Farms, schools, churches and public sector

Farms and rural estates. Livestock and arable farms, stores and estate workshops across County Durham, the Tees Valley and Northumberland. See agricultural and farm solar.

Schools and academies. Daytime use during term matches generation well. We plan work around the school calendar.

Churches and charities. Halls, community buildings and charity premises. We give trustees plain figures for their committee.

Public sector. Council, NHS and emergency-service buildings, depots and leisure sites. We hold CHAS accreditation, which public bodies and main contractors often ask for. See office and public sector solar.

Maintenance and remedial work

Including on systems installed by other firms: inspection, fixing and re-certifying non-compliant systems, and ongoing maintenance.

FAQ

Commonly Asked Questions

Yes. We cover Teesside, County Durham, Sunderland, Tyneside and Northumberland from our base in Beverley, and we install commercial systems across the UK.

Northern Powergrid, the same company that runs the network in Hull and East Yorkshire. We handle the G99 application with them, which typically adds 8–12 weeks before installation.

Yes. We work to your site inductions, permits and RAMS, and if you or your customer has an approved-equipment list, we can design the system around it.

We design the fixings and layout for the site’s exposure, as we did at Woodsmith Mine near Whitby, where we used a low-ballast flat-roof system designed for a high-wind location. We check the roof structure and condition first.

Typically about £17,000–£21,000 for 30 kWp, £28,000–£37,000 for 50 kWp and £50,000–£65,000 for 100 kWp, excluding VAT. Systems of 150 kWp and above are typically about £420–£650 per kWp. Book a free survey for an accurate quote.

Many rooftop systems on commercial buildings fall under permitted development, subject to conditions and size limits. Ground-mounted arrays are more likely to need planning permission, and listed buildings and protected areas can need extra checks. We’ll check for your site and apply if it’s needed.

Exposed and coastal sites

Coastal and upland sites in the North East see strong winds and salt air. We design fixings and layouts for the site’s exposure. On the same Northern Powergrid network, we built a 51.03 kWp low-ballast flat-roof array at Woodsmith Mine near Whitby, designed for a high-wind location. We check the roof structure and condition first on every job.

Areas we cover in the North East

We work with businesses, farms and organisations across:

  • Sunderland and Washington: including the International Advanced Manufacturing Park area and the Washington estates
  • County Durham: Newton Aycliffe (including Aycliffe Business Park), Durham, Chester-le-Street, Spennymoor, Peterlee, Consett and Bishop Auckland
  • Teesside: Stockton, Billingham, Middlesbrough, Redcar, Hartlepool and the Wilton area
  • Darlington and the A66: Darlington and the surrounding farms
  • Tyneside: Gateshead, Newcastle, North and South Tyneside
  • Northumberland: Cramlington, Blyth, Hexham and the rural county

These are areas we cover, not a list of past installs. We also cover commercial solar in York and North Yorkshire.

What we install

  • Rooftop solar PV on profiled metal, composite, fibre-cement, flat and pitched roofs. See our commercial solar service.
  • Flat-roof systems with low-ballast or ballasted mounting, designed for wind load and roof capacity.
  • Commercial battery storage (see below).
  • MID metering with remote reading.
  • Workplace and fleet EV charging fed by solar and storage.
  • Remedial work on existing systems: inspecting, fixing and re-certifying systems installed by other firms.

Battery storage for North East sites

A battery stores midday surplus for early starts, late shifts and the evening, instead of exporting it at a low rate. It can also help where the network operator limits your export, and on some tariffs it can trim short demand peaks. We size batteries from your half-hourly data, your tariff and your solar generation, and we’ll tell you if a battery doesn’t pay its way. Commercial battery storage typically costs about £350–£450 per kWh installed, including the hybrid inverter. More detail: commercial battery storage.

Grid connection (G99) in the North East

The North East’s local network is run by Northern Powergrid (its Northeast licence area), the same company that runs the network in Hull and East Yorkshire, where we’re based. Almost every commercial system needs G99 approval before installation. We prepare and submit the application with the technical details and single-line diagrams the DNO needs, and deal with any queries. Approval typically adds 8–12 weeks before installation, so we start it early.

If the DNO limits your export, a G100 export limitation scheme or a battery means you still use what you generate on site. Already have G99 approval for an older system? Tell us at the start, because we can sometimes size the new inverter to fit within it. Read more: G99 applications explained.

Planning in the North East

Many rooftop systems on commercial buildings fall under permitted development, subject to conditions and size limits. Ground-mounted arrays are more likely to need planning permission. Local factors include:

  • The North Pennines National Landscape and Northumberland National Park, where extra conditions can apply.
  • Durham Castle and Cathedral World Heritage Site and Hadrian’s Wall, and their settings.
  • Conservation areas and listed buildings, including older industrial and farm buildings.

We’ll check for your site and apply if it’s needed.

Typical costs

Indicative installed costs for commercial solar PV, by system size:

  • 30 kWp: about £17,000–£21,000
  • 50 kWp: about £28,000–£37,000
  • 100 kWp: about £50,000–£65,000
  • 150 kWp and above: about £420–£650 per kWp

Commercial battery storage typically costs about £350–£450 per kWh installed, including the hybrid inverter. As a real example, a 42 kWh battery with a 20 kW hybrid inverter added to an existing system came to about £16,000.

Prices exclude VAT, which is charged at 20% on commercial installs. Simple roofs with good access sit at the lower end. Fibre-cement roofs, premium panels, scaffolding and safety systems such as rooflight protection or Man-Safe lifelines push the price up. Every quote sets out equipment, installation, scaffolding and DNO costs separately, so you can compare like for like.

Finance and payback

  • Outright purchase: the best long-term return if you have capital available. Ask your accountant about capital allowances.
  • Business finance or leasing: spreads the cost. See solar finance.
  • Power Purchase Agreement (PPA): little or no upfront cost. You buy the power generated on your roof at an agreed rate. See PPAs.

Payback depends on how much of the generation you use on site, your unit rate, the system size and how easy the roof is to work on. We model it from your half-hourly data and show the expected payback in your proposal.

Get a solar assessment for your North East site

Send us a recent electricity bill, your half-hourly data if you have it, and details of any existing G99 approval. We’ll come back with an initial view on system size and whether solar makes sense for your building.

Book a free survey · Call 01482 765063 · info@brightedgesolar.com

BrightEdge Solar Ltd, Colonial House, Swinemoor Lane, Beverley HU17 0LS. MCS certified (NIC-601602). RECC member.

Why BrightEdge

  • CHAS accredited for health and safety, which main contractors and public bodies often require.
  • MCS certified (NIC-601602) and a RECC member.
  • 24-month insurance-backed workmanship warranty, and we register the manufacturer warranties on the equipment.
  • Northern Powergrid experience: G99 handled with the same network company we deal with in Hull and East Yorkshire.