Last updated 19 November 2026 · BrightEdge Solar team
Short answer: Yes, businesses can get paid for exported solar. Under the Smart Export Guarantee (SEG), a business, farm, school or charity with solar of up to 5 MW in Great Britain can sign up for an export tariff with a SEG licensee.[1][2] There’s no government-set rate. Each supplier sets its own price, which only has to stay above zero.[1] Export usually earns far less than you pay for grid power, so the best commercial systems are sized to use most of their solar on site.
When we model a commercial system, the export rate is one of the numbers people ask about most. It matters, but usually less than people expect. This guide explains how SEG rates for business work, who has to offer them, what you need before you can be paid and how much weight to put on export when you’re deciding on system size or a battery. It covers Great Britain. Northern Ireland isn’t part of the SEG.[2]
Key facts
- Up to 5 MW is covered. Solar PV installations in Great Britain with a total installed capacity of up to 5 MW are eligible. Above 5 MW, export is sold on commercial terms outside the SEG.[2][3]
- Suppliers set the rate. SEG licensees decide the tariff, contract length and other terms. The only floor is that the rate must always be above zero.[1][5]
- Twelve suppliers must offer it in 2026–27. For the SEG year from 1 April 2026 to 31 March 2027, Ofgem lists 12 mandatory SEG licensees and 4 voluntary ones.[4]
- You need a half-hourly export meter and an export MPAN. Payment is based on metered export, not an estimate.[3]
- You don’t have to use your own supplier. Your SEG licensee can be a different company from the one that supplies your electricity.[2][3]
How the Smart Export Guarantee works for a business
The SEG started on 1 January 2020, after the Feed-in Tariff closed to new applicants.[1][3] It’s set out in the Smart Export Guarantee Order 2019 and in the electricity supply licence conditions.[5][6] It doesn’t treat businesses differently from homes. The rules are about the installation: the technology, its size, its certification and its meter.[3]
You apply to a SEG licensee, which checks that the installation is eligible and then confirms the tariff in writing. That written confirmation is your SEG contract.[3] Payments are based on your export meter readings.[1]
Who has to offer a SEG tariff
Electricity suppliers with at least 150,000 domestic electricity customers on 31 December must be SEG licensees for the next SEG year, which runs from 1 April to 31 March. Smaller suppliers can choose to opt in.[5] Suppliers that aren’t SEG licensees can still pay for export, but they don’t have to follow the SEG rules.[5]
| SEG year 2026–27 (1 April 2026 to 31 March 2027) | Suppliers listed by Ofgem |
|---|---|
| Mandatory SEG licensees | British Gas Trading, E (Gas and Electricity), E.ON Next Energy, EDF Energy Customers, Electricity Plus Supply (Utility Warehouse), Foxglove Energy Supply, Fuse Energy Supply, Octopus Energy, OVO Electricity, ScottishPower Energy Retail, So Energy Trading, Utilita Energy |
| Voluntary SEG licensees | Pozitive Energy, Ruby Electricity, Smart Pay Energy, Voltx Power |
Source: Ofgem’s SEG supplier list for the seventh SEG year.[4] Ofgem publishes a new list each year, so check it again before 1 April 2027.
What you need before you can be paid
Ofgem’s guidance for generators sets out three things every application must show.[3]
- Certification. For solar up to 50 kW, both the installation and the installer must be suitably certified, usually with an MCS certificate (or an equivalent scheme). For solar above 50 kW and up to 5 MW, the installation must be certified, and each SEG licensee decides what evidence it accepts.[3]
- An export meter that reads half-hourly. It must sit where the installation connects to the network. Your existing meter may be able to record export, so ask the SEG licensee.[3]
- An export MPAN. This is a separate 13-digit reference from the import MPAN on your bills. Your SEG licensee can help you get one.[3]
The licensee doesn’t have to start paying until it can get readings from your export meter, so it’s worth sorting the meter and MPAN while the system is being commissioned.[3]
If your site already gets Feed-in Tariff export payments, it can’t get SEG payments for the same installation as well. A system that gets FIT generation payments only (having opted out of FIT export) can take a SEG tariff.[3]
What exported solar is worth compared with using it
Because there’s no fixed SEG rate, the most useful comparison is with what you pay for grid electricity. The government’s figures for April to June 2026 put the average non-domestic electricity price at 24.51p per kWh, including the Climate Change Levy and excluding VAT (provisional).[7]
| Every 1,000 kWh of solar | Value |
|---|---|
| Used on site, at the 24.51p/kWh average non-domestic price[7] | about £245 |
| Exported at 4p/kWh (an export rate one of our East Riding farm clients was offered) | about £40 |
The table below shows what different export rates would earn on 10,000 kWh of exported solar a year. These are worked examples, not quotes from any supplier.
| Export rate (example) | 10,000 kWh exported a year earns |
|---|---|
| 2p/kWh | £200 |
| 4p/kWh | £400 |
| 8p/kWh | £800 |
| 15p/kWh | £1,500 |
Whatever rate you get, a unit used on site is normally worth several times more than a unit exported. That’s why we size commercial systems around daytime demand first and treat export as a bonus. Our guide to commercial solar payback shows how both feed into the figures.
How to compare SEG tariffs
Ofgem advises generators to shop around and keep reviewing their options, because tariffs differ and change.[2][3] When you compare offers, check:
- the rate and whether it’s fixed or variable
- the contract length and how you can leave
- any conditions, such as whether the rate depends on buying your electricity from the same supplier
- how payment is calculated: you’re entitled to payment based on actual meter readings, even if a supplier also offers other payment models[2]
- what certification evidence they need for a system over 50 kW.[3]
If you switch SEG licensee, any export between the end of the old contract and the start of the new one isn’t the new licensee’s responsibility, so line up the dates.[3]
When export matters more, and when it doesn’t
Export matters more when the building is empty for long periods in summer (some farms, schools in the holidays, seasonal businesses), when the roof is much bigger than the daytime load, or when you’re planning ahead for more demand later.
Export matters less when you use most of your solar during the day. Manufacturers, cold stores, care homes and offices with steady daytime loads often use most of what they generate.
Two other things limit how much export is worth chasing:
- The DNO may cap your export. On many sites the network can’t take everything a big array produces, and the system is set up to limit export. See export limitation (G100) explained.
- A battery may be worth more than export. Storing surplus solar for the evening can be worth more than selling it cheaply, but only if your half-hourly data supports it. See is a battery worth it for your business?
For larger sites, a power purchase agreement is another route. The provider owns the system and you buy the power, so export is part of their figures rather than yours. Our guide to PPA vs buying outright compares the two.
In practice: storing solar instead of selling it at 4p
At an agricultural site in the East Riding of Yorkshire, the client was being offered just 4p/kWh for export, so they wanted to store their surplus rather than sell it cheaply. We replaced their existing 20 kW inverter with a Fox ESS H3 20 kW hybrid, reused the cabling and installed 41.93 kWh of batteries in the farm shed, with new three-phase metering and monitoring. A smaller battery would have filled in under an hour at peak. The job is on our battery storage page.
Frequently asked questions
Can a business get paid for exporting solar electricity?
Yes. Any eligible installation of up to 5 MW in Great Britain can get a Smart Export Guarantee tariff from a SEG licensee, whether it’s on a business, farm, school, charity or home. The rules depend on the installation, not on who owns it.
What is the SEG rate for business in 2026?
There isn’t one set rate. Each SEG licensee sets its own tariff and contract terms, and the only legal requirement is that the rate stays above zero. Compare offers from several suppliers, as Ofgem advises.
Do I need MCS certification for SEG on a commercial system?
For solar up to 50 kW, the installation and installer need to be suitably certified, usually through MCS or an equivalent scheme. For solar above 50 kW and up to 5 MW, the installation must be certified, and each SEG licensee decides what evidence it accepts.
Do I have to get my SEG tariff from my electricity supplier?
No. Your SEG licensee can be a different company from the one that supplies your electricity. Check whether a tariff’s rate depends on also buying your power from that supplier.
What happens with systems over 5 MW?
Installations over 5 MW aren’t covered by the SEG. Any export tariff for them is agreed on commercial terms with a supplier.
Is it better to export or add a battery?
It depends on your half-hourly data and tariff. Exported power usually earns much less than grid power costs, so storing surplus solar can be worth more, but only if you use that stored power. We model both before you decide.
Ready to see what your solar would earn?
Send us your electricity bills or half-hourly data and we’ll model how much of your solar you’d use on site, how much you’d export and what a battery would add, with the cost and estimated payback set out in plain figures. We install commercial solar and batteries across Hull, East Yorkshire, Yorkshire and the North of England. We’re MCS certified and CHAS Elite accredited.
Book a free survey · Call 01482 765063
Sources
- Ofgem, Smart Export Guarantee (SEG): https://www.ofgem.gov.uk/environmental-and-social-schemes/smart-export-guarantee-seg (checked 19 Nov 2026)
- Ofgem, Smart Export Guarantee (SEG) – Generators: https://www.ofgem.gov.uk/environmental-and-social-schemes/smart-export-guarantee-seg/generators (checked 19 Nov 2026)
- Ofgem, Smart Export Guarantee: Guidance for generators: https://www.ofgem.gov.uk/guidance/smart-export-guarantee-guidance-generators (checked 19 Nov 2026)
- Ofgem, Smart Export Guarantee Supplier List (SEG year 1 April 2026 to 31 March 2027): https://www.ofgem.gov.uk/guidance/smart-export-guarantee-supplier-list (checked 19 Nov 2026)
- Ofgem, Smart Export Guarantee (SEG) – Electricity suppliers: https://www.ofgem.gov.uk/environmental-and-social-schemes/smart-export-guarantee-seg/electricity-suppliers (checked 19 Nov 2026)
- The Smart Export Guarantee Order 2019, SI 2019/1005: https://www.legislation.gov.uk/uksi/2019/1005/contents/made (checked 19 Nov 2026)
- DESNZ, Quarterly Energy Prices: September 2026 (table 3.4.2, provisional April to June 2026): https://assets.publishing.service.gov.uk/media/6aba2810fe72ed1e2b02f0e7/Quarterly_Energy_Prices_September_2026.pdf (checked 19 Nov 2026)