Four Indurent warehouse units on the same business park each needed their own solar system, sized to the unit and connected to the grid in its own right. That meant four designs, four sets of G99 paperwork and one programme to bring them all online together. We delivered the work as the solar installer for the main contractor.
Our solution
We sized each roof individually. The two largest units each carry 164 LONGi 440 W panels (72.16 kWp), each feeding a Solis 60 kW three-phase inverter. Units 7 and 8 carry 28.6 kWp and 46.64 kWp.
On the metal roofs we used Renusol MetaSole, a low-profile above-roof mounting system for metal roofs.
We handled the G99 grid connection process for all four units and completed G99 commissioning and electrical testing on each one.
The results
All four systems were commissioned on 21 February 2025, giving the park 219.56 kWp of rooftop solar across four separately connected units.
Old agricultural store re-clad and turned into a solar PV powerhouse Re-clad agricultural store with solar and Fox ESS battery, Little Habton Along with a
A 257 kWp commercial install of JA Solar 555 W panels across a profiled trapezoidal roof, feeding two 110 kW inverters through a new purpose-installed consumer unit.